Critical actors identified that are needed to implement the ReCreate value chain commercially (including both direct and indirect actors as well as currently existing actors and possibly missing actors). These mappings depict the actors and linkages between them, and consequently, structures of the business ecosystem as well gaps and dynamics within it. D7.1 is based on the work done in Task 7.1.
Intended for all project participants, including a project management plan, guidelines, training material for partners on research, ethics, project procedures, gender issues, etc.
Based on the experiences and know how developed in the real-life pilots, this report will evaluate the projects on their merits and drawbacks and formulate the overall recommendations regarding the deconstruction phase. Different deconstruction and harvesting techniques for precast elements are evaluated, comparing deconstruction processes and equipment from economic, technical, work safety and sustainability viewpoints with recommendations for the development of equipment. Recommendations and general methodology for achieving an optimised deconstruction process, which starts with the pre-deconstruction audit feeding the data into the design and BIM environment, combined withquality management requirements and LCA calculations, thus optimising the overall reuse benefit balance. A methodology towards deconstruction optimisation in relation to new designs and to be used as input for design optimisation in WP5.D2.2 is based on the work done in Task 2.2.
Business model canvases for concrete reuse are identified, analysed and developed. This includes the value proposition (offering, customers), how value is captured (costs, revenues) and how value is delivered (e.g. partners, channels) through concrete reuse. Business model canvases provide profound understanding on how concrete reuse businesses are construed on company, system and process levels and enable developing business models for concrete reuse.D7.2 is based on the work done in Task 7.2.
Defining quality management practices such as setting criteria for how and by whom the project deliverables will be reviewed prior to submission
Methods and procedure described and tested in pilot project. Results will fed to T2.1, T3.3 and T5.1–T5.3.D4.1 is based on the work done in Task 4.1.
Presentation video and aminations are created.D9.3 is based on the work done in Task 9.3.
Data management plan that was created specifically for the project.
Project logo visual identity and website are createdD92 is based on the work done in Task 92.